Bricklaying in Brent

Get Bricklaying Prices in Brent

Home > General Building Projects > Bricklayers > Brent

Bricklaying in Brent

Extensions will usually demand brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a brick wall with a couple of windows is added to the front or side of the property.

 

This solid wall requires foundations or lintel supports which may or may not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they will require extra insulation. Normally, this is achieved with the addition of internal wall insulation like insulated plasterboard, or by adding a supplementary layer of brickwork to create a cavity wall. These options are again determined by the existing garage foundations. In addition, if the walls are shared with a neighbour's property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the house.

 

Unlike lots of ideas, a bricklayer really does more than laying of bricks. There's even more to being a bricklayer than you can most likely consider. A solitary bricklaying jobs requires a broad selection of abilities. Allow's take a look at these skills!

  • Making use of moist resistant materials to seal foundations.
  • Spreading mortar between joints and applying them to act as a thick layer binding the blocks together in rows.
  • Reading as well as working from requirements as well as strategies.
  • Working with brick-cutting equipments.
  • Taking charge as well as taking care of concrete blocks or bricks, clay bricks as well as the sort.
  • Building of scaffolding - subject to belongings of some licenses in some states.

This is not just an cosmetic choice, as matching existing brickwork is potentially a requirement of planning permission or building regulations in your area. We will offer up to 4 Bricklayers pros locally, that will provide quotes for the job you desire done. You'll receive a property visit from experts in Brent that'll help you to select the right Bricklayers for your home before accomplishing the installation. Enter your postal code to start browsing now.

Average Bricklayers cost in Brent

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Brent, as reported by local Quotatis members.

Bricklayers installation cost in Brent 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in March 2024

Bricklayers Projects in Brent in February 2024

0

Requests for quotations in Brent in February 2024

0

Requests for Bricklayers quotations in Brent in February 2024. 0% change from January 2024.

0

Requests for Bricklayers quotations in London County in February 2024. 0% change from January 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Brent February 2024

Brent

The London Borough of Brent is a London borough in north west London, and makes up part of Outer London. Brent was formed in 1965 from the area of the former Municipal Borough of Wembley and Municipal Borough of Willesden of Middlesex. Its name derives from the River Brent which runs through the borough. The main areas are Kilburn, Wembley and Harlesden. It borders the boroughs of Harrow towards the north-west, Barnet towards the north-east, Camden to the east, Westminster to the south-east, and Kensington and Chelsea, Hammersmith and Fulham, and Ealing to the south. The local authority is Brent London Borough Council. Brent includes a mixture of residential, industrial and industrial land. A lot of the eastern border is formed by the Roman road Watling Street, which is now the modern A5. The borough covers a total area of 16.70 square miles. Based on population estimates from the middle of 2014, the town is believed to have a permanent population of around 320762. Inside this population, 23.17 per cent own their home outright, and a additional 31.33 per cent own their home with a mortgage. Brent is also amongst the most diverse localities inside the country, with large Asian and Indian, Black African, Black Caribbean, Irish (biggest within the nation), and Eastern European communities. The borough is served by several London Underground, London Overground and National Rail stations. Brent is known most famously as the home to Wembley Stadium, which is among the country's most significant landmarks, and Wembley Arena. For all of your home upgrades, make sure that you use trustworthy professionals in Brent to ensure that you get the very best quality.

Looking for Bricklayers in Brent?

Get free quotes from local builders

Get free quotes

Bricklayers pros in Brent

J Alexander Building and Maintenance

1 review(s)
Based: in Barking, IG11 9JN

Latest review

G., IG6
4

Building work | Bricklaying in Ilford

He is very keen

Similar Customer Enquiries for Bricklayers in Brent

20 Apr

Building work | Bricklaying

London - NW6

Enquiry from: Wael A

Start Date: Immediate

repointing of side wall of a victorian terrace and a chimney. are you the property owner: owner of the property property type: terrace what type of work do you need to have done: brick work do you ha...

Post a similar request >

01 Mar

Building work | Bricklaying

London - NW8

Enquiry from: Chris G

Start Date: Immediate

200m long by 2m high block wall incl foundations, piers at 9m centers 450 square. Allow for 600x600 strip footings

Post a similar request >

23 Feb

Building work | Bricklaying

Harrow - HA1

Enquiry from: Deanna H

Start Date: Immediate

I need the my front garden wall redone Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Small job Do you require the bricks ...

Post a similar request >

29 Jan

Building work | Bricklaying

Edgware - HA8

Enquiry from: Alpa P

Start Date: Immediate

Property owner Please call to appoint

Post a similar request >

09 Aug

Building work | Bricklaying

London - NW10

Enquiry from: James B

Start Date: 1 to 3 months

Great, so where are you looking to have the work done? Build Wall Supply skips in order to remove existing fencing. Approximately 40 meters long. Supply bricks and rest of the materials, Double brick...

Post a similar request >

10 Aug

Building work | Bricklaying

Harrow - HA3

Enquiry from: Tim O

Start Date: 1 to 3 months

Part of front wall of the property need rebuilding and gate replaced (insurances claim) Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs...

Post a similar request >

29 Sep

Building work | Bricklaying

Edgware - HA8

Enquiry from: Art H

Start Date: Immediate

Build 2 extension walls 100mm blocks on the flat 12.4 long x 2m high.(1000 blocks) 3 walls total 12.2 long by 2.7 high standard build (on edge) 330 blocks. Are you the property owner: Owner of th...

Post a similar request >

19 Mar

Building work | Bricklaying

Rickmansworth - WD3

Enquiry from: Drew M

Start Date: Immediate

repair of the top level of a rendered brick wall that blew of in storm eunace. are you the property owner: owner of the property property type: semi detached how much work would you say needs to be do...

Post a similar request >

25 Feb

Building work | Bricklaying

Windsor - SL4

Enquiry from: Richard C

Start Date: Immediate

Bricklayers Lead Bricklayers Lead

new garden wall required to replace garden fence. 23m long x 2.3m high. mini digger access. other side of wall can be plain, due adjacent to commercial building. are you the property owner: owner of ...

Post a similar request >

23 Nov

Building work | Bricklaying

Gerrards Cross - SL9

Enquiry from: Kay B

Start Date: Immediate

new brick built wall between back yard with neighbouring yard requires new sheet metal security gate (solid sheet not railing, and narrow about 600mm to 700mm wide) to conform with right of way. total...

Post a similar request >

01 Oct

Building work | Bricklaying

Staines-upon-Thames - TW19

Enquiry from: Monica F

Start Date: Immediate

erection of right-side neighbouring single brick wall partitioning. are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: small job do...

Post a similar request >

08 Sep

Building work | Bricklaying

Windsor - SL4

Enquiry from: Murray H

Start Date: Immediate

job 1. take down and remove existing wall. replace with. 9" brick wall 12 ft long 4 ft height 1 pier on end .topped with brick on edge. heather's. approx 900 bricks. lay on existing good footing. job...

Post a similar request >

05 May

Building work | Bricklaying

Chalfont St. Giles - HP8

Enquiry from: Angus M

Start Date: Immediate

we are the main contractor on the project to demolish and rebuild the above. we have a requirement for a blockwork contractor within the next 10 days we would like to it local are you the property ow...

Post a similar request >

10 Oct

Building work | Bricklaying

Slough - SL2

Enquiry from: Nina H

Start Date: Immediate

various brick work needed are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to be supplied to...

Post a similar request >

17 Sep

Building work | Bricklaying

Rickmansworth - WD3

Enquiry from: Rajesh S

Start Date: Immediate

move brick pillar on front wall to widen driveway entrance. front wall is small in height. need to put a slight edge block on grass to reflect the wider drive. are you the property owner: owner of th...

Post a similar request >

11 Aug

Building work | Bricklaying

Gerrards Cross - SL9

Enquiry from: Matt K

Start Date: Immediate

Are you the property owner: Owner of the property Property Type: Semi detached How much work would you say needs to be done: Medium job

Post a similar request >

30 Sep

Building work | Bricklaying

Rickmansworth - WD3

Enquiry from: Malcolm R

Start Date: Immediate

Bricklaying 3 small garden walls on existing foundations - all materials supplied and on site Wall 1 - Low (21"x9"x21 bricks) wall of 6 facing brick courses and two backing block courses plus a cappi...

Post a similar request >

01 Jun

Building work | Bricklaying

Egham - TW20

Enquiry from: C G

Start Date: 1 to 3 months

Taking down a chimney and side wall of a grade 2 listed building and rebuilding it with a double brick wall and lime rendering it after... Time scale: 1-3 months

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions so we can match you with professionals who can help.

Find up to 4 Builders in Brent

Get free, no-obligation quotes from 4 verified Builders working in Brent.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

FAQs

Can bricklayers work in the rain?

Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!

lDetermine The Concrete Protective Tents Required

• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.

• Firstly, calculate the amount of space required to lay the brick wall

• Then, incorporate the appropriate size and number of tents.

lSet Up The Tents

• Follow the manufacturer’s instruction to set up the tents

• Once installed, the tent should extend past the location for the bricklaying and slope downwards.

l Access The Area

• Inspect the location during rainfall to ensure water is not sneaking through.

lBuild a Lumber Frame

• Use 2 to 4 pieces of lumber to build a frame.

• Set it into the ground depending on the size of your wall

lApply Concrete or Mortar

• Fill up the frame with either concrete or mortar.

• Follow the manufacturer’s instruction to allow the mixture to cure.

lPrepare the Brick Wall’s Mortar

• Mix the mortar for the brick wall construction

• Follow the manufacturer’s instruction for the process.

When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

What is a bricklayer?

This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.

Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!

• Using damp resistant materials to seal foundations.

• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.

• Reading and working from specifications as well as plans.

• Working with brick-cutting machines.

• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.

• Construction of scaffolding - subject to possession of some licenses in some states.

A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.

A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:

• Ability to work at heights and outdoors

• Enjoy practical work

• Technical aptitude

• Good hand-eye coordination

• Independent and yet a team player too

• Top physical fitness

• Attitude and attendance.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

Placholder Image

Other Top Projects in Brent

Need more help?

House Extension Cost Guide Published: 10/03/2020 Why relocate when you can just change your property? If staying exactly where you are sounds good, you need three things to ensure you get the best quote and construction possible: research, planning and reliable help. No house extension cost is minor, but with good preparation you can keep your budget at the lower end […] Read this article
Understanding Permitted Development Rights Published: 07/02/2020 An extension is a great way to add extra space to your home and make it look even more attractive. But this kind of project needs more than financial and structural plans. Submitting your design to your local authority for permission costs money and takes time. However, there are ways to extend your property without planning permission, and it’s completely […] Read this article
Why a Glazed Extension is a Great Way to Expand Your Home Published: 21/06/2017 Building an extension is something that homeowners are doing a lot these days. As property prices rise, homeowners are finding it harder to afford to upgrade to larger properties so are remaining in the same home for longer. Building an extension has several advantages. Not only will it increase the amount of space in your […] Read this article

Are you a builder in Brent?

We can help you get more Bricklayers work and boost your business.

Join today