Bricklaying in Dudley

Find Bricklaying Prices in Dudley

Home > General Building Projects > Bricklayers > Dudley

Bricklaying in Dudley

Extensions will usually demand brickwork of some form, either to infill the existing gaps or even to add insulation to pre-existing brick walls. For most conversions, the garage door is infilled and a brick wall with one or two windows is put into the front or side of the house.

 

This solid wall will demand foundations or lintel supports which may or may not already be present under the existing door. Often the window will not be a full width to match the existing garage door, so the new brickwork wall should take this into consideration. Depending on the current thickness of the outer brickwork walls, they might require additional insulation. This is usually achieved by adding internal wall insulation like insulated plasterboard, or with the addition of an additional layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbour's property, the brickwork must adhere to building regulations on sound proofing. With all brickwork on garage conversions, it is important to consider the existing brickwork of the house.

 

In contrast to several ideas, a bricklayer actually does more than laying of blocks. There's even more to being a bricklayer than you can probably think about. A solitary bricklaying tasks needs a broad array of abilities. Let's look at these abilities!

  • Making use of moist resistant materials to secure foundations.
  • Spreading out mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.
  • Checking out as well as functioning from specifications as well as strategies.
  • Working with brick-cutting machines.
  • Taking charge as well as taking care of cement blocks or blocks, clay bricks and the likes.
  • Building of scaffolding - subject to possession of some licenses in some states.

This is not merely an aesthetic choice, as complementing existing brickwork is possibly a requirement of planning permission or building regulations in your area. We will provide up to 4 Bricklayers pros locally, who will supply quotations for the job you desire done. You'll obtain a property visit from experts in Dudley that'll help you to select the right Bricklayers for your house before performing the installment. Enter your postcode to start looking currently.

Average Bricklayers cost in Dudley

The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100

Average price per Bricklayers job in 2024

Avg. price low

Avg. price low
£300

Avg. price

Avg. price
£400

Avg. price high

Avg. price high
£460

£600

£450

£300

£150

£0

Prices based on actual Bricklayers costs for Dudley, as reported by local Quotatis members.

Bricklayers installation cost in Dudley 2024

Labour cost £280
Material cost £100
Waste removal £20
Time frame: 1-10 days

Bricklayers searches in March 2024

Bricklayers Projects in Dudley in February 2024

1,929

Requests for quotations in Dudley in February 2024

0

Requests for Bricklayers quotations in Dudley in February 2024. 0% change from January 2024.

0

Requests for Bricklayers quotations in West Midlands in February 2024. 0% change from January 2024.

Source: Numbers calculated based on the search volumes in major search engines

Bricklayers searches in cities and towns near Dudley February 2024

Dudley

Situated in West Midlands, Dudley is a substantial town with a population of over 300,000. This makes Dudley the second biggest town in the UK behind Reading. The town is near to two major cities, with Wolverhampton to the south and Birmingham towards the northwest. The town sought to earn city position in 2012, but lost out to Chelmsford, Perth and St. Asaph. For any property enhancement you need, assess rates from vetted and reliable trade professionals close to you.

Looking for Bricklayers in Dudley?

Get free quotes from local builders

Get free quotes

Similar Customer Enquiries for Bricklayers in Dudley

29 Aug

Building work | Bricklaying

Dudley - DY3

Enquiry from: David R

Start Date: Immediate

repointing of 2 walls needed (a couple of the bricks will need recementing). the walls are both approx 60cm (2feet) high, one is approx 450cm long (178 inches) and the other is approx 470cm long (18...

Post a similar request >

07 Mar

Building work | Bricklaying

Bewdley - DY12

Enquiry from: Alan R

Start Date: Immediate

garden wall repair and rebuild are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to be suppl...

Post a similar request >

14 Feb

Building work | Bricklaying

Birmingham - B14

Enquiry from: Soffia M

Start Date: Immediate

i'd like a quote please for a brick feature wall. size is 1675mm wide x 1350mm high. 10-20mm thickness brick preferred. postcode is *** are you the property owner: owner of the property property type...

Post a similar request >

22 May

Building work | Bricklaying

Kidderminster - DY11

Enquiry from: Gill U

Start Date: Immediate

need a garden wall built ab*** high and 72 ft length. labour only l will supply all materials are you the property owner: owner of the property are you the property owner: relative of owner are you th...

Post a similar request >

25 Apr

Building work | Bricklaying

Kidderminster - DY10

Enquiry from: Razu M

Start Date: 1 to 3 months

Build Brick entrance wall Are you the property owner: Owner of the property Property Type: Detached Roughly the size of your garden: Unsure Garden Type: Front garden Do you have a design: No, but...

Post a similar request >

07 Jun

Building work | Bricklaying

Birmingham - B30

Enquiry from: D

Start Date: Immediate

Building extension and loft conversion

Post a similar request >

01 Apr

Building work | Bricklaying

Kidderminster - DY11

Enquiry from: Johnie. W

Start Date: Immediate

Need a competent bricklayer to add to our existing,,fireplace ,200bricks???thereabouts in a herringbone pattern,,

Post a similar request >

10 Mar

Building work | Bricklaying

Birmingham - B45

Enquiry from: Brian W

Start Date: Immediate

replace approx. 8 bricks to a pillar & make good (replace) bricks to the house there was a arch which fell down Homeowner Please contact to appoint

Post a similar request >

How it works

Tell us about your Bricklayers project

Answer a few quick questions so we can match you with professionals who can help.

Find up to 4 Builders in Dudley

Get free, no-obligation quotes from 4 verified Builders working in Dudley.

Hire with confidence

Compare customer reviews, services and prices, and choose the right professional for you.

FAQs

How many bricks can a bricklayer lay in a day?

Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.

With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.

In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.

With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.

How much sand do I need for bricklaying?

Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.

Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!

• Get about 50kg of sand and air dry it.

• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).

• Mix the cement and sand to form a smooth, uniform and consistent colour.

• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.

With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.

What cement should I use for bricklaying?

Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.

For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.

Cement provides a plethora of uses in bricklaying and these includes:

• Preparation of cement concrete

• Preparation of cement mortar

• Building fireproof and thermal proof structures

• Building chemical proof structures

• Serving as a grout material

• Building hydrographic and frost resistant structures

• Manufacturing precast members

• Constructing aesthetic concrete

• Constructing cement concrete roads

There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.

Do bricklayers work in the winter?

Yes, bricklayers can work during the cold months, but it all depends on the type of work involved. For instance, residential housing maintenance works such as tuck pointing deficient mortar joints on exterior walls and columns as well as rebuilding of chimneys are best tackled during summer or simply put, the warmer months of the year. This is is mainly because the best results for these activities are achieved in the warmer months and several bricklayers will agree to this fact.

Mixing of mortar using anti-freeze technique to counter-act the effects of a cold weather can lead to white marks trailing down the brick when warmer temperatures comes knocking. As a result, even mortar mixing should be done at temperatures exceeding zero degree farenheit which will hold no serious consequences if the temperature should change to a little bit below the norms. During the winter, a good technique that can be incorporated to when mixing mortar would be to mix them in smaller quantities in a warmer environment. These small quantities will immediately be fed by the labourers to the bricklayers and in such circumstances, the mixed mortars will not be subjected to a freezing temperature for too long.

Generally, it would be very unwise to consider any bricklaying work to be done whenever the temperature jumps to a certain level which would be considered to be very inconvenient to work in. Interior works like remodelling of fireplaces can be tackled so long there is a warm space to mix the mortars while also keeping the materials at an indoor temperature. Bricklaying works that have, however, been completed during the colder months should be subjected to a very close inspection as well as looking for potential damage that can be caused to existing works as a result of the harsh weather.

Placholder Image

Other Top Projects in Dudley

Need more help?

House Extension Cost Guide Published: 10/03/2020 Why relocate when you can just change your property? If staying exactly where you are sounds good, you need three things to ensure you get the best quote and construction possible: research, planning and reliable help. No house extension cost is minor, but with good preparation you can keep your budget at the lower end […] Read this article
Understanding Permitted Development Rights Published: 07/02/2020 An extension is a great way to add extra space to your home and make it look even more attractive. But this kind of project needs more than financial and structural plans. Submitting your design to your local authority for permission costs money and takes time. However, there are ways to extend your property without planning permission, and it’s completely […] Read this article
Why a Glazed Extension is a Great Way to Expand Your Home Published: 21/06/2017 Building an extension is something that homeowners are doing a lot these days. As property prices rise, homeowners are finding it harder to afford to upgrade to larger properties so are remaining in the same home for longer. Building an extension has several advantages. Not only will it increase the amount of space in your […] Read this article

Are you a builder in Dudley?

We can help you get more Bricklayers work and boost your business.

Join today